Diesel crack sealing machine mainly hand-push and self-propelled hand pouring tube operation, the use of imported diesel oil burner heating.
First, the bin was added at work or asphalt pouring glue, start the generator power, followed by intermittent open conducting oil pump switch, burner switch, discharge tube heating switches;
Second, automatic temperature control system to adjust the temperature of the same material and by diesel automatic burner hot melt tank HTF began to heat up (trailer for the forced circulation) melting the material, the temperature is controlled by the automatic control system. Soluble material time is about 30-40 minutes.
In the material melts, the material tube temperature can reach after work. Hand pouring tube alignment crack pouring process. Asphalt pump discharge flow rate is adjustable. In the course of adding materials to ensure the continuity of the work at any time. Before pouring want to clear the dust cracks within the joint treatment.
With decades’ development,Shanghai Doan Machinery Technology Co.,Ltd. has absorbed the top technical talents to keep continuous innovation in leading high-end road maintenance equipment. Pavement Crack Repair Series,Pothole Repair Series,Pavement Surface Construction Series,Asphalt Mixture Equipment Series,Compaction Equipment Series,Concrete Construction Series and Pavement Maintenance Material Series are the main 7 series of products we are serving for customers.